Practical guides: delivering, recovering and developing projects
Lessons from our sites, practical guides, explainers: what we learn in the field, put in writing.
20 practical guides, written by Alain Bonnetaud. They cite 161 articles of French law, each linked to its source on Légifrance.
20 guides
Studying and structuring a project
You own a building or a plot of land and want to know what it could become.
5 guides
French law of 16 June 2025: what changes for office-to-residential conversions
The French law of 16 June 2025 makes it easier to convert offices into housing in three ways: a possible exemption from the land-use rules of the local zoning plan (PLU), a building permit allowing successive uses in certain areas, and a co-ownership vote by the Article 24 majority.14 min readUpdated 10 legal texts citedGeneral contractor or separate trade packages: how should you structure your project?
With separate trade packages, the client signs one contract per trade and organises their coordination.13 min readUpdated 12 legal texts citedConverting an industrial building: the step-by-step method
Converting an industrial building starts with three surveys: soil contamination, asbestos and structure.16 min readUpdated 18 legal texts citedProperty development for a retail brand: the 6 steps
Property development for a retail brand follows six steps: searching for premises, qualifying each site, checking its technical, regulatory and financial feasibility, structuring the deal (lease or off-plan lease (BEFA), permits), running the works, then opening.16 min readUpdated 11 legal texts citedRetail planning consent (CDAC) in France: thresholds, application, appeals
In France, retail planning consent (AEC) is required to open or extend a shop or a retail complex with more than 1,000 m² of sales area.17 min readUpdated 25 legal texts cited
Running and recovering a site
Your project is defined and needs to be built: we run the site, or take over a stalled one.
12 guides
Practical completion: how to prepare for it and clear the snags
Practical completion (réception) is the act by which the client declares that it accepts the works, with or without snags; it is declared jointly, in the presence of both parties.11 min readUpdated 8 legal texts citedSite abandonment: what to do when a contractor walks off the job
When a contractor abandons the site, the client acts in this order: secure the site, have progress recorded jointly, stop payments at the value of work done, notify insurers and guarantors, serve formal notice on the contractor, terminate the contract in due form, then price the remaining work and tender for a replacement contractor.18 min readUpdated 24 legal texts citedContractor in liquidation: how to regain control of the site
When a contractor on site goes into compulsory liquidation, its works contract is not terminated automatically.14 min readUpdated 19 legal texts citedStalled site: how to build a recovery plan that holds
When a site has stalled, the client acts in this order: protect the works, have their condition recorded, notify insurers and guarantors, identify the cause of the stoppage, then settle the status of each contract.12 min readUpdated 10 legal texts citedOutsourcing client-side project management: which framework to choose
There are three frameworks for outsourcing the client role on a private project.11 min readUpdated 14 legal texts citedConstruction supervision (MOEX): tasks and deliverables on a private contract
On a private contract, construction supervision (MOEX) carries out the tasks its contract assigns to it: most often the approval of construction design documents, direction of the works (DET) and assistance at practical completion (AOR).13 min readUpdated 11 legal texts citedScheduling and coordination (OPC): how to assess its cost and value
The cost of a scheduling and coordination (OPC) assignment is not set by any official fee scale.10 min readUpdated 4 legal texts citedSite audit: how to get a diagnosis you can act on
A site audit is an observation and analysis assignment, commissioned by the client, that establishes the true state of a project: progress, sums invoiced and paid, schedule, outstanding documents and decisions.11 min readUpdated 4 legal texts citedConstruction delays: how to prove them and apply penalties
On a private contract in France, delay penalties come not from the law but from the contract: their rate, their cap and their starting point are those set by the clause.11 min readUpdated 9 legal texts citedPayment certificates: what to check on a private contract
On a private contract, the payment certificate is the document by which the lead consultant, having checked the interim valuation, proposes to the client the amount to be paid.13 min readUpdated 10 legal texts citedConstruction drawing approval: how to organise statuses and drawing flow
Construction drawing approval (visa) is the lead consultant’s review of whether the construction drawings produced by the contractors comply with the design.11 min readUpdated 7 legal texts citedMOEX, OPC, AMO: who does what on your project?
Construction supervision (MOEX) directs the works and answers for their compliance.6 min readUpdated 3 legal texts cited
Finding an operator, letting premises
You are looking for premises for your business, or a property to convert.
3 guides
Finding a hotel operator for a building: method, contracts, permits
To find a hotel operator for a building, look for one before the project is designed.16 min readUpdated 27 legal texts citedHow do you find an operator for a retail unit?
To find an operator for a retail unit, start by establishing what the unit allows: floor area, clear height under beams, access, electrical capacity, permitted use.12 min readUpdated 7 legal texts citedShort-term commercial leases (bail dérogatoire): term, uses, risks and reclassification
A short-term commercial lease (bail dérogatoire) allows a retail unit to be let outside the statutory commercial lease regime, provided the total term of the lease or of successive leases does not exceed three years.11 min readUpdated 8 legal texts cited