MOEX, OPC, AMO fees: what does it cost to run a construction project?
At PRIMOE, construction supervision (MOEX) on its own, without design, costs between 3 and 5% of the cost of the works excl. VAT, and a scheduling and coordination (OPC) assignment between 0.8 and 2%. Owner’s representation (AMO) is priced according to the assignment: a single stage or the whole project. In France there is no fee scale: fees are freely agreed and set by the contract. Here is what moves these figures, and how to compare two proposals.
Request a proposal +33 1 72 68 22 71
By Alain Bonnetaud, founder of PRIMOE · Updated
What do MOEX, OPC and AMO cost at PRIMOE?
The two site-phase services are priced as a percentage of the cost of the works excl. VAT; AMO and the audit of a stalled site are priced on quotation, once the assignment has been defined in writing.
| Service | PRIMOE fees | What makes the amount vary |
|---|---|---|
| Construction supervision (MOEX), without design | 3 to 5% of the cost of the works excl. VAT | Size of the project, number of trade packages, length of the works, condition of the existing building in refurbishment |
| Scheduling and coordination (OPC) | 0.8 to 2% of the cost of the works excl. VAT | Number of contractors to coordinate, length of the works, site constraints, presence required on site |
| Owner’s representation (AMO) | Depending on the assignment: fixed fee per phase, day rate for one-off input | Stages covered, duration, complexity of the project, skills you already have in-house |
| Audit of a stalled site | On quotation, based on the time required | Size of the building, number of trade packages, state of the documents, any dispute or insolvency proceedings under way |
In France, fees for design and supervision work (maîtrise d’œuvre) follow no official scale: they are freely set in the contract, as a fixed fee, per phase or as a percentage of the works. Our ranges apply to projects in Île-de-France.
Would you like a figure for your project?
What does a percentage mean on a real project?
Terms used on this page
- Cost of the works excl. VAT
- The total of the works contracts, excluding VAT: the basis for the percentage.
- Fixed fee
- A price set in advance for a defined assignment.
- Per phase
- A fee split by stage: design studies, tendering, works, practical completion.
For €2 million excl. VAT of works, construction supervision (MOEX) alone at 3 to 5% comes to €60,000 to €100,000 excl. VAT in fees, and an OPC assignment at 0.8 to 2% comes to €16,000 to €40,000 excl. VAT. The calculation is indicative: where a project sits in the range is set once we have read the project file.
The percentage applies to the cost of the works, not to the cost of the project: land, taxes and other fees are not part of the base.
When MOEX and OPC are awarded together, the client has a single point of contact for the whole works phase, and neither meetings nor site minutes are duplicated. The fee is then negotiated for the assignment as a whole.
What drives the price of a site-phase service?
The time the assignment takes. That time depends less on the cost of the works than on the number of parties involved, the length of the works and what comes to light along the way.
The number of trade packages and contractors
With separate trade packages, each contractor is one more interface to direct and coordinate.
The length of the works
A longer job means more meetings, more site minutes and more site visits.
The existing building
In refurbishment, discoveries on site mean reworking the schedule and putting new documents through approval.
The site
An occupied, hemmed-in or high-rise site calls for precise phasing and more frequent checks.
The presence required
A meeting every week or every other week, an extra visit on sensitive trade packages: the frequency is set in the contract.
How do you compare two fee proposals?
Like for like. Two percentages cannot be compared unless they cover the same presence, the same deliverables and the same duration.
Five questions to ask of every proposal.
How much presence on site?
How often meetings and visits take place, and who attends.
Which deliverables?
Drawing approval register, site minutes, payment recommendations, formal records: the list must be written into the contract.
What duration is assumed?
A proposal based on a twelve-month job is not priced the same as one based on eighteen months.
What if the works run longer?
A clear proposal says so: an extension fee, a price per additional month, or nothing provided for.
How many sites does the project manager run?
At PRIMOE, three at most. That is what makes the promised presence genuinely achievable.
To go further, see our guides scheduling and coordination (OPC): cost, deliverables and selection criteria and construction supervision (MOEX): tasks and deliverables on a private contract.
Would you like a detailed, item-by-item proposal?
Frequently asked questions
Another question? Call us on +33 1 72 68 22 71 or email contact@primoe.fr.
How much does construction supervision (MOEX) cost?
At PRIMOE, a construction supervision (MOEX) assignment on its own, without design, costs between 3 and 5% of the cost of the works excl. VAT. Where it sits in that range depends on the size of the project, the number of trade packages, the length of the works and, in refurbishment, the condition of the existing building.
How much does an OPC assignment cost?
At PRIMOE, a scheduling and coordination (OPC) assignment costs between 0.8 and 2% of the cost of the works excl. VAT, depending on the number of contractors to coordinate, the length of the works, site constraints and the presence required on site.
How much does owner’s representation (AMO) cost?
It all depends on the assignment: AMO can cover a single stage, such as tendering, or the whole project. It is most often paid as a fixed fee per phase, with a day rate for one-off input. The amount is set once the assignment has been defined in writing.
Is there an official scale for design and supervision fees?
No. In France, design and supervision fees are not regulated: they are set in the contract, as a fixed fee, per phase or as a percentage of the cost of the works.
Does the percentage apply to the total cost of the project?
No, to the cost of the works excl. VAT. Land, taxes, other fees and finance costs are not part of the calculation base.
What happens if the works take longer than planned?
It depends on the contract. A clear proposal provides for this: a price per additional month or an extension fee. Otherwise, the question gets settled when the delay occurs, which is rarely the best time.
How much does an audit of a stalled site cost?
It is priced on the time required, on quotation. That time depends on the size of the building, the number of trade packages, the progress to be recorded, the state of the documents and whether there is a dispute or insolvency proceedings.
How do I get a proposal from PRIMOE?
Send us the brief, the estimated cost of the works, the planned schedule and the procurement route (main contractor or separate trade packages). We will reply with a written proposal: scope, deliverables, presence and fees.




