Roissy-en-Brie (77) · Housing
46 homes in the town centre, in two buildings, for SCCV CENTREVILLE – REAL PROMOTION. PRIMOE ran the construction phase for 16 months, with some twenty separate trades, through to handover in July 2026.
Apartment buildings, refurbishments, mixed-use schemes and serviced residences: each project is described by the role PRIMOE played and what was at stake.
Completed
In progress
Study delivered
Design
In progress
Study delivered
Study delivered
Study delivered
46 homes in the town centre, in two buildings, for SCCV CENTREVILLE – REAL PROMOTION. PRIMOE ran the construction phase for 16 months, with some twenty separate trades, through to handover in July 2026.

15 homes and a shop, built over the Metro line 5 tunnel. PRIMOE has provided construction supervision (MOEX) and scheduling and coordination (OPC) since February 2026, and restarted the works after the main contractor defaulted. Handover is scheduled for July 2027.

PRIMOE carried out the audit of the existing building and the feasibility study for the planning change of use, then the sketch design and preliminary design (APS) of this housing project, with a timber façade and a green roof.

A 1960s office tower converted into a hotel residence of about 90 rooms. Before the acquisition, PRIMOE carried out the technical and regulatory study, the planning certificate and the capacity study of the typical floor, and found the operator.

A retail park of four units and about 5,740 m², with 160 basement parking spaces, studied with its retail brands: regulatory study (PLU, SCoT, CDAC), feasibility, presentation to the town hall and outline design on a digital model.

The conversion of a closed hotel-restaurant of about 2,150 m² into a food store, in the Seine flood zone: digital model survey of the existing building, tender documents in 16 trade packages, all-trades cost estimate and regulatory study.

Refurbishment of an old building in the heart of Marseille, on Rue Saint-Ferréol. The aim: bring out the value of the existing building without betraying its architecture, with the same standard of documentation as in Île-de-France.

PRIMOE carried out the audit of the existing building and the feasibility study for the planning change of use, then the sketch design and preliminary design (APS) of this housing project, with a zinc façade and a green roof.
Detailed references, site visits and client contacts are available on request, with due respect for our clients’ confidentiality.