A real estate project calls on technical, administrative, financial and contractual skills for several months. For an owner, an investor or a retail brand, bringing these together in-house does not always match the volume of activity. Outsourcing makes it possible to strengthen the team, handle a peak in workload or oversee a project far from base.
Choosing the provider must, however, come after a decision on organisation: do you expect analysis, the preparation of decisions or the power to bind the client? This difference determines the contract, the controls to put in place and the liabilities to examine.
Which client-side tasks can be outsourced?
Almost every client-side task can be given to a third party: project structuring, tendering, tracking permits and consents, the budget, coordinating advisers, preparing for practical completion. What cannot be delegated without saying so is the decision: the brief, the budget envelope and the choice of contractors stay with the client, unless there is a written mandate.
The need is described stage by stage. A one-off project and a roll-out across several sites do not call for the same continuity of service.
The invitation to tender must specify the resources the client already has in-house. A provider tasked with preparing decisions needs a counterpart able to take them. Outsourcing the preparation without organising the decision-making leaves the main risk of deadlock in place.
You also need to identify the skills that stay with the other parties: design, construction supervision (MOEX), scheduling and coordination (OPC), legal expertise or financing. The outsourced assignment must fit them together without creating overlaps or gaps. To place each role, see our guide MOEX, OPC, AMO: who does what.
AMO, delegated project management or property development contract: which to choose?
The choice turns on the power you hand over. If you want advice and to keep the signature, it is AMO. If the provider is to sign and pay in your name, it is a mandate: delegated project management. If it is to commit to a price and answer for the contractors, it is a property development contract.
Scroll the table sideways →
| Framework | What the provider does | Who signs the contracts | Point to clarify |
|---|---|---|---|
| AMO (owner’s representation) | Advises, analyses and prepares decisions | The client | Who takes and records each decision? |
| Project management (conduite d’opération) | Organises the monitoring of the project within a defined scope | The client | Which deliverables, interfaces and powers are included? |
| Mandate, or delegated project management (MOD) | Acts in the name and on behalf of the client | The agent, within the limits of the mandate | Which acts, up to what amount, with what reporting? |
| Property development contract (CPI) | Has the project built for an agreed price and guarantees that the contractors perform their obligations | The developer | What price, what guarantees, which legal regime applies? |
Owner’s representation provides advice and prepares decisions within the agreed scope. The power to sign for the client cannot be inferred from the AMO label alone. If it exists, it must be set out in a written authorisation. Our AMO service is an advisory service: we analyse, recommend and flag risks, and you keep the signature.
Under French law, a mandate allows a representative to act for the principal and in the principal’s name, within the limits set (Article 1984 of the Civil Code and Article 1989 of the Civil Code). The client is bound to honour the commitments made by its agent in line with the authority given (Article 1998 of the Civil Code). “Delegated project management” (maîtrise d’ouvrage déléguée) is industry usage, not a category of the Civil Code: on a private project, it means a mandate, and it is the written powers that count.
The property development contract is a framework of its own. Under French law, the developer undertakes to have a construction project carried out, for an agreed price and through contracts for works (louage d’ouvrage), and may take on the legal, administrative and financial operations involved. It guarantees the performance of the obligations of the parties it has contracted with in the client’s name (Article 1831-1 of the Civil Code, restated in Article L221-1 of the Construction and Housing Code). Its legal regime therefore cannot be reduced to that of an extended advisory service.
How the contract is classified depends on what the agreement contains and how it is performed. The label given to the contract cannot set aside a legal regime that matches the commitments actually made. Under French law, for a residential building, or one for mixed professional and residential use, a contract by which a person undertakes to the client to have a building built, in a capacity other than seller or contractor, is subject to the rules of the property development contract, save for the exceptions provided in the same text (Article L222-1 of the Construction and Housing Code).
For a private project, the rules on public-sector client mandates (Article L2411-1 of the Public Procurement Code and Article L2422-5 of the Public Procurement Code) are not the default legal framework. They apply to the French State, local authorities and certain other bodies, not to a property owner or a retail brand.
In short: the owner’s representative advises, the agent signs, the developer guarantees. The name given to the contract decides nothing: it is the powers handed over and the commitments made that determine the applicable legal regime, the liabilities and the insurance to require.
Which powers should you give the provider?
Hand over specific acts, not a general delegation. The contract lists each act (tendering, negotiating, signing a contract, approving an amendment, recommending a payment, declaring practical completion), names who performs it and, where needed, sets a ceiling or a prior approval. Decisions that shape the project stay with the client.
The client can reserve the decisions that shape the project: changes to the brief, exceeding the budget envelope, choice of contractors, financing and litigation. An emergency procedure must also be provided for measures essential to protect people or property, with prompt reporting.
Scroll the table sideways →
| Act | Question for the contract to settle |
|---|---|
| Tendering | Who settles the list of contractors invited to tender and the selection criteria? |
| Signing the works contracts | Does the provider sign, and up to what amount? |
| Contract amendments and variations | Above what threshold is the client’s approval required? |
| Payments | Who checks the interim valuations, and who orders payment? |
| Practical completion | Who declares practical completion and signs the practical completion certificate? |
| Litigation and insurance claims | Who notifies claims, and who decides to take action? |
The powers communicated to third parties must match the contract. A restriction left in an internal annex does not effectively govern dealings with the contractors: under French law, an act performed beyond the agent’s powers is still binding on the client if the third party legitimately believed those powers were real, in particular because of the client’s conduct or statements (Article 1156 of the Civil Code). Delegations, their dates and any revocations are kept up to date.
Practical completion deserves a line of its own: it is the act by which the client declares that it accepts the works, with or without snags (Article 1792-6 of the Civil Code). If an agent is to declare it, the mandate must say so expressly.
How do you control the budget and conflicts of interest?
Control rests on three rules: regular reporting that separates committed spending, forecasts and risks; a fee whose calculation can be checked; and a written declaration of the provider’s links with contractors, suppliers and advisers. Under French law, every agent must account for its management.
This duty to account is written into French law for a mandate (Article 1993 of the Civil Code); for AMO, it is the contract that sets its form and frequency. The report sets out the decisions to be taken, their consequences and the assumptions used. The client thus keeps sight of the cost at completion, not just of the payments already made.
The fee can be fixed, staged or on a time basis within agreed limits. If an incentive is provided for, its calculation must be verifiable. An apparent saving achieved by cutting a necessary service must not be presented as an equivalent improvement to the project.
Any links between the provider and contractors, suppliers or advisers are declared and addressed in how the project is organised. The procedures for tendering, evaluating bids and approving payments must remain clear to the client. The choice of contracting structure for the works also affects this control: see general contractor or separate trade packages.
What insurance and what continuity should you require?
Insurance follows the powers handed over. For advisory AMO, ask for professional indemnity insurance. Under French law, an agent whose assignment is comparable to that of a contractor under a contract for works is deemed a builder and must carry ten-year latent defects liability insurance (décennale). Ask for the certificates before the assignment starts and check them against the contract.
An advisory assignment, a power of representation and work liable to engage a builder’s liability do not carry the same risks. Under French law, anyone who, although acting as the agent of the owner of the works, performs an assignment comparable to that of a contractor (locateur d’ouvrage) is deemed a builder (Article 1792-1(3) of the Civil Code). That person must then be covered by ten-year latent defects liability insurance (Article L241-1 of the Insurance Code).
Building damage insurance (dommages-ouvrage) is another matter to allocate: under French law, it must be taken out before work starts on site by whoever has the works carried out, whether acting as owner, seller or the owner’s agent (Article L242-1 of the Insurance Code). The outsourcing contract says who takes it out and who manages it.
Continuity also concerns teams and data. The contract provides for replacements, handover of files, the client’s access to the online platforms and the terms on which the assignment ends. Documents must be retrievable in usable formats, with their history and the related decisions.
This reversibility is prepared from the outset. If the relationship ends, the project must keep its budget position, its contracts, its deadlines and its document file, without depending on a belated reconstruction.
In short: before signing, check three documents: the list of acts the provider may perform in your name, its insurance certificates measured against those acts, and the clause that returns your files to you, complete and readable, on the day the assignment ends.
Outsourcing client-side project management: the questions owners ask
What is the difference between AMO and delegated project management?
The owner’s representative (AMO) advises the client, who decides and signs. The delegated project manager acts under a mandate: it signs the contracts, orders payments or declares practical completion in its client’s name, within the written limits of the mandate. The difference therefore lies in the power to bind the client, not in the amount of work.
Can an owner’s representative sign the works contracts?
No, not under an assistance assignment alone: the AMO label gives no power of representation. If you want your representative to sign certain acts, you need a written mandate, limited to the acts it specifies and communicated to the contractors concerned. Otherwise, you remain the sole signatory.
Does delegated project management exist in French private law?
The French Civil Code does not name it. On a private project, the term refers to a mandate, governed by Article 1984 onwards of the Civil Code. The client mandate described in the Public Procurement Code concerns public-sector clients. Your contract must therefore set out the powers, the limits and the reporting itself.
Must a delegated project manager carry ten-year liability insurance?
Yes, under French law, where its assignment is comparable to that of a contractor under a contract for works: the owner’s agent is then deemed a builder and subject to the duty to insure its ten-year latent defects liability. For a purely advisory assignment, the position is different. In every case, ask for the certificate and check that it covers the acts provided for in the contract.
Does outsourcing transfer all the risks?
No. The transfer depends on the commitments made, the guarantees and the applicable rules. With AMO or a mandate, the client remains bound by the contracts signed by it or in its name. Only a contract such as a property development contract commits the provider to a price and makes it guarantee the contractors’ obligations.
Who bears a budget overrun?
It depends on its cause and on the contract. Assistance or a mandate does not, in itself, carry any guarantee of the final price: the overrun is borne by the client, unless the provider is at fault. Under a property development contract, the developer commits to an agreed price. Commitments on the budget envelope must be in writing.
When should you consider a property development contract?
When you expect the provider to have the project built for an agreed price and to answer for the contractors. For a residential or mixed-use building, French law may impose this regime depending on the commitments made, whatever the contract is called. Have a legal adviser confirm how the arrangement is classified before you sign.
How do you build an organisation in proportion to the project?
Start from your in-house resources. If someone on your side can decide quickly, AMO is usually enough. If nobody can sign within the timescales of the works, a mandate limited to specific acts is justified. The property development contract meets a different need: transferring the price risk.
These arrangements are not mutually exclusive: an AMO assignment can be supplemented by a written mandate, limited to a few acts. PRIMOE provides owner’s representation in Paris and Île-de-France. In Paris 15th, we act as owner’s representative on a high-rise building: feasibility, then the search for an operator; a hotel operator has been found. The brief, the schedule, the internal organisation and the first contracts give a concrete basis for scoping an assignment.
To go further: our Delivery path, which brings together AMO, MOEX and OPC, and the guide MOEX: tasks and deliverables for the construction phase. To discuss it: contact@primoe.fr.



