Saint-Ouen (93)
- Brief
- Housing
- Service
- Audit, feasibility, sketch design and preliminary design (APS)
- Status
- Study delivered
PRIMOE carried out the audit of the existing building and the feasibility study for the planning change of use, then the sketch design and preliminary design (APS) of this housing project, with a timber façade and a green roof.



