02PRIMOE Delivery · Building the project
Your construction project, run through to handover.
We act as your owner’s representative (AMO), supervise the works (MOEX), coordinate contractors and the schedule (OPC), and restart stalled sites. Every decision is in writing.
Our method
From contract signature to the handover of the keys.
Every phase, every party, every decision has its place. And everything is in writing.
- 01Prepare
- 02Direct
- 03Coordinate
- 04Hand over
01 · Prepare
What happens before the first spade goes in?
- What we do
- We check the contractors’ construction drawings, set the schedule and organise the site set-up.
- What you get
- A site that starts on checked drawings.
02 · Direct
Who runs the site day to day?
- What we do
- We chair the site meetings, issue the minutes, record decisions and check every contractor invoice before payment.
- What you get
- Minutes issued and decisions recorded, week after week.
Who does what
Who steps in, and when?
AMO, MOEX, OPC: each service can be commissioned alone or with the others, from the brief to the end of the warranty period.
03 · Coordinate
How do you keep to the schedule?
The OPC service (scheduling, management and coordination) keeps the schedule up to date, milestone by milestone, sets the sequence of contractors trade by trade, and flags any delay or cost overrun as soon as it appears.
Schedulekept up to date, milestone by milestone
Sequencingbetween contractors, trade by trade
Alertsas soon as a delay or overrun appears
04 · Hand over
How does handover work?
- What we do
- We inspect the building with you, list the defects to be fixed (the snag list, ‘réserves’ in French) and track their correction, contractor by contractor.
- What you get
- A building handed over, its snags cleared, and its full documentation.
And if the site stops?
We know how to restart it.
We record the state of the site with all parties, close the accounts, cost the remaining work and bring in a new contractor.
Let’s talk about your projectWhat you receive
Everything is in writing, and it stays with you.
What is seen on site is written down, issued and tracked: a site is run with documents, not with emails.
- Site minutesWritten and issued to all parties, with photos and the contractors concerned.
- Decision logWho decided what, when, and what it changes.
- Works scheduleKept up to date, step by step, with the sequence of contractors.
- Defect trackingEvery defect to fix: photo, location, contractor, correction date.
- Checked invoicesWhat is paid matches what is done.
And if the site stops?
We restart stalled sites: we record the state of the site with all parties, close the accounts, cost the remaining work, then restart with a new contractor. See our site recovery service.
Tools
From an observation on site to a cleared snag.
We develop our own project management software, including a site app made available on every one of our projects. What is seen on site is written down, issued and tracked: a site is run with documents, not with emails.

- Location
- Building B · 2nd floor · living room B21
- Contractor
- Package 05 · External joinery
- Finding
- Sealing joint to be redone at the base of the window frame.
- 12.1
Structural work on the 3rd floor completed, upper slab pour confirmed.
Pkg 02 - 12.2
External joinery construction drawings approved with comments.
Pkg 05 - 12.3
Sealing joint to be redone at the base of the window frame, living room B21. 1 photo
Pkg 05 - 12.4
Service shaft openings to be corrected before the next pour.
Pkgs 02 · 09
Written from the observations recorded on site
- ClientRead
- Package 02 · Structural worksRead
- Package 05 · External joineryRead
- Package 09 · PlumbingSent
- ArchitectRead
14 recipients · read receipts tracked
- RecordedPhoto, location, contractor
- Sent to the contractorWith minutes no. 12
- Clearance confirmedPhoto of the fix attached
Who, what, where, when: everything is recorded and dated.
Projects
Our sites, completed or in progress.
Frequently asked questions
What people ask us.
What is the difference between MOEX, OPC and AMO?
Owner’s representation (AMO, assistance à maîtrise d’ouvrage) sits on the client’s side: it advises the client, prepares their decisions and checks that the other parties keep their commitments. Construction supervision (MOEX, maîtrise d’œuvre d’exécution) directs the execution of the works: compliance, quality, approvals, through to completion. Scheduling and coordination (OPC, ordonnancement, pilotage et coordination) organises the timing of the works: schedule, coordination of contractors, sequencing of trades. We provide these services alone or combined; the details are in our guide MOEX, OPC, AMO: who does what.
What should I do if my site has stopped?
Secure the site, have the condition of the works recorded in writing, and notify insurers and guarantors within the contractual deadlines. Then audit the remaining work before re-engaging anyone. We step in from this stage: audit of the existing works, costing of the remaining work, recovery plan, then management of the site through to completion. See our stalled site recovery method.
Can MOEX and OPC be given to the same firm?
Yes, it is the most common combination: a single point of contact is then accountable for compliance and the schedule throughout the works phase. Owner’s representation (AMO) is most useful when it stays separate, on the client’s side. See our guide MOEX, OPC, AMO: who does what.
Do you work for developers?
Yes. We take on all or part of the delivery of their projects as MOEX and OPC, with written minutes and dated commitments.
Can you step in on a site that has already started?
Yes, starting with a written condition report. If the site has stopped or is going off track, see our stalled site recovery service.