Operator search
Operator search means finding the business that will run an asset: a hotel, shop, restaurant or service business. PRIMOE first assesses the property, presents it to operators whose business suits it, then opens up the file in stages, through to the meeting with the owner.
Let’s talk about your asset +33 1 72 68 22 71
By Alain Bonnetaud, founder of PRIMOE · Updated
In Paris 15th, we found the hotel operator for a high-rise building.
Owner’s representation (AMO) on a high-rise building in the 15th arrondissement: PRIMOE led the feasibility study, then the search for a hotel operator, and found one.
The operator shapes the brief from the feasibility stage.
For a project that is meant to be operated, it pays to look for the operator early. In Paris 15th, the search followed the feasibility study, in a demanding technical and regulatory context specific to high-rise buildings.
An asset studied before it is presented.
We present assets that PRIMOE has studied: every piece of information states its source and date.
- Île-de-Francewhere our team is based
- 15 yearsin construction
Does your asset need an operator?
What is an operator search?
Terms used on this page
- Operator
- The business that runs the place: hotelier, retail brand, restaurateur.
- Catchment area
- The geographical area from which most of a shop’s customers come.
- Non-disclosure agreement
- What gives access to the detailed file.
Finding an operator is not just a matter of posting an advert and waiting for applications. It is a job of technical assessment and targeting: knowing what the place can genuinely be used for, then presenting it to operators whose site-selection criteria match its characteristics.
The most common mistake is to look for an operator before the property’s technical and commercial characteristics have been objectively established. If your asset has not yet been studied, start with PRIMOE Development: we establish its condition, what the rules allow there and the possible uses, with costings.
Are you an operator looking for premises for your business? See PRIMOE Activation.
How does an operator search work?
The search follows five steps: assess the asset, target the operators, present them with a file, release information as their interest is confirmed, then arrange the meeting with the owner.
-
Assess the asset
Before thinking about who might operate the place, you need to know what it can genuinely be used for: clear height under beams, access and deliveries, electrical capacity, floor loading, ventilation and extraction, parking, and the use permitted by the current lease. Under French law, that last point may call for a change to the lease’s permitted use (déspécialisation), either partial (Article L145-47 of the Commercial Code) or full (Article L145-48).
What you getThe technical and commercial assessment of the asset
-
Target the operators
We cross-check three things: the technical profile of the place, its catchment area and the expansion plans of operators. Sending the file out widely, without targeting, brings in unsuitable applications and prolongs the vacancy.
-
Present the file
Complete technical data sheet, catchment area analysis, state of the local market, terms of the current or proposed lease, dimensioned plans and photographs. An incomplete file gets put on hold by operators’ site-selection committees.
What you getThe asset presentation file
-
Release information in tiers
First the essentials, publicly; then the detailed file, after a non-disclosure agreement; finally the in-depth documentation, reserved for candidates whose project has been vetted.
-
Arrange the meeting
Site visit and questions, with a PRIMOE contact who knows the file, then introduction of the operator to the owner.
What you getThe operator’s interest, passed on to the owner
What does an operator see, and when?
Information is released in three stages. Nothing confidential is made public: the detail opens up once the operator’s interest is confirmed.
| Level | What the operator receives | Access condition |
|---|---|---|
| Presentation | The location, the project, the possible uses and visuals. | Public |
| Detailed file | Plans, floor areas, technical and regulatory data. | After signing a non-disclosure agreement |
| In-depth documentation | Surveys, title deeds and the study’s figures, with their sources. | Reserved for candidates whose project has been vetted |
Frequently asked questions
Another question? Call us on +33 1 72 68 22 71 or email contact@primoe.fr.
Which assets do you present?
Assets that PRIMOE studies for their owners in Île-de-France: buildings, premises and sites to be converted. For each one, the study establishes the possible uses, and the presentation is aimed both at operators looking for premises for their business and at investors looking for a property to convert.
Should you find the operator before starting the works?
It pays to look early. The operator’s requirements (floor areas, access, technical installations) shape the project; knowing them before the works avoids redoing what has just been built. See our guide to finding a hotel operator for a building.
Do you have an asset to promote?
Start with PRIMOE Development: we establish the condition of your property, what the rules allow there and the possible uses, with costings. Once the study is done, PRIMOE Activation prepares its presentation to operators and investors, in Île-de-France.
How does an operator access the detailed file on an asset?
In three stages. PRIMOE first presents the asset publicly: location, project, possible uses and visuals. After signing a non-disclosure agreement, you get access to the detailed file: plans, floor areas, technical and regulatory data. Surveys, title deeds and the study’s figures are then reserved for candidates whose project has been vetted.
How do you know which operators to target?
Targeting cross-checks the technical assessment of the unit (floor area, clear height, access) against an analysis of its catchment area and the expansion plans of the brands active in the region and in the relevant sector.
How long does it take to find an operator?
It depends on the quality of the assessment, how well targeted the search is and how complete the presentation file is. A properly assessed asset, presented to operators whose business suits it, finds a taker faster than a property circulated without preparation.




