Scheduling and coordination (OPC, for ordonnancement, pilotage et coordination) organises the timing of a construction project: the sequence of tasks, keeping to the schedule, the interfaces between contractors. PRIMOE builds the schedule for your site, coordinates the contractors trade package by trade package and keeps to the deadlines, in Paris and Île-de-France, either on its own or combined with construction supervision (MOEX). Our OPC fees range from 0.8 to 2% of the cost of the works excl. VAT (our fees).

Let’s talk about your site +33 1 72 68 22 71

By Alain Bonnetaud, founder of PRIMOE · Updated

Site management office: drawings spread out, a hard hat and a wall schedule, with the construction site in the background
GuideOPC services: cost and value

At PRIMOE, a start date on site is a written commitment.

We build the schedule for your site, coordinate the contractors trade package by trade package and keep to the deadlines. Every trade knows when it is due on site, and on what conditions.

A decision-making tool, not a schedule pinned to the meeting-room wall.

Our OPC schedule is kept continuously up to date in our in-house software: binding on the parties, and shared with them.

On its own, or with construction supervision.

We provide OPC on its own or combined with construction supervision (MOEX): taking both services together gives the client a single point of contact for the whole works phase.

  • 0.8 to 2%of the cost of the works excl. VAT, for OPC
  • 3 sitesat most per project manager
  • Île-de-Francewhere our team is based

A schedule to build, or to rescue?

Let’s talk about your site +33 1 72 68 22 71

What is OPC?

The three words behind the acronym

Scheduling (ordonnancement)
Sets the sequence of tasks.
Management (pilotage)
Makes sure the schedule is kept to.
Coordination
Settles the interfaces between contractors.

Scheduling, management and coordination organises how the works unfold over time. Scheduling sets the sequence of tasks, management makes sure the schedule is kept to, and coordination settles the interfaces between contractors.

Without rigorous OPC, trade packages get in each other’s way, delays pile up and every lost week costs money. With OPC properly run, everyone knows the critical path and slippage is dealt with as soon as it appears.

PRIMOE builds a binding schedule and enforces it, trade package by trade package, on multi-unit housing, refurbishment and mixed-use projects. It is one of the services of PRIMOE Delivery.

How does an OPC assignment work, step by step?

The OPC consultant first builds the construction schedule with the contractors, then keeps it alive through to handover: it tracks progress, coordinates the interfaces between trade packages and reschedules when something unexpected happens. French public procurement law lists the scheduling, management and coordination of the works among the components of a design team (maîtrise d’œuvre) assignment (Article R2431-1 of the Public Procurement Code); private contracts in France use the same terms.

During site preparation

  1. Scheduling

    The project is broken down into tasks by trade package and by zone, with durations, sequences and constraints (deliveries, drying times, tests, access), agreed with the contractors during site preparation.

  2. Construction schedule

    An overall schedule, then detailed schedules for each phase; the critical path is identified and circulated to every party.

    What you getThe construction schedule and the detailed schedules

During the works

  1. Management

    Regular comparison of planned against actual progress, written reminders to contractors who fall behind, recovery measures discussed in meetings.

    What you getSchedule updates

  2. Interface coordination

    The order of work and the scope boundaries between two trade packages (builder’s work openings, supports, connections, finishes), so that no element of the works is left without someone responsible for it.

    What you getCoordination meeting minutes

  3. Delay tracking

    Delays, their causes and their effects recorded in writing as the works proceed, not pieced together at the end.

    What you getAn up-to-date delay log

At the end of the works

  1. Testing and completion

    Scheduling of the tests, the pre-completion inspection and the clearing of the snags.

The up-to-date delay log is the basis for any later discussion of delay penalties: see our guide construction delays, proof and penalties.

How does OPC fit with MOEX and health and safety coordination?

The three roles cover the same site but different things: construction supervision (MOEX) answers for compliance with the contracts and for quality, OPC for time and the sequence of tasks, and the health and safety coordinator (coordonnateur SPS) for preventing the risks of several contractors working at once. They rely on the same schedule without standing in for one another.

MOEX, OPC and health and safety coordinator: what each role answers for on a site
RoleWhat it answers forIts link to the schedule
Construction supervision (MOEX) Compliance with the contracts, and quality Commissioned together with OPC, it avoids duplicate reporting lines: a single point of contact for the works phase
OPC Time and the sequence of tasks Builds the schedule and keeps it up to date
Health and safety coordinator (coordonnateur SPS) Preventing the risks of contractors working at the same time The schedule is one of the coordinator’s inputs: any rescheduling that changes who works alongside whom is passed on to them

Under French law, health and safety coordination is organised on any site where several contractors work, subcontractors included, to prevent the risks arising from their simultaneous or successive work (Article L4532-2 of the Labour Code). The coordinator is appointed by the client (Article L4532-4 of the Labour Code). This is not the OPC consultant’s role, but the schedule is one of the coordinator’s inputs: any rescheduling that changes who works alongside whom must be passed on to them.

When OPC and construction supervision (MOEX) are held by different firms, it must be set down in writing who calls the meetings, who writes the minutes and who notifies contractors of delays. Commissioned together, the two services avoid this duplication. Our guide MOEX, OPC, AMO: who does what on your project sets out how the work is split.

Street front of the Pantin housing project: a white building with loggias, set between two existing buildings
Pantin (93) · street front

Two housing projects where contractor coordination is decided trade package by trade package.

Pantin (93)

Brief
Housing
Service
Construction supervision (MOEX)
Status
In progress

A housing project in the inner suburbs of Paris, carried out under construction supervision (MOEX). A constrained site where contractor coordination makes the difference on deadlines.

Roissy-en-Brie (77)

Brief
Housing
Service
Construction supervision (MOEX)
Status
Completed

A housing project run under construction supervision (MOEX), from the first trade package to practical completion. Contractor coordination, schedule and costs kept under control through to handover.

See all our projects

When should you bring in OPC?

The right time is before the works contracts are signed: the construction schedule and the contractors’ scheduling obligations can then be written into the contract documents. Appointed later, the OPC consultant works with the deadlines already signed and starts by reviewing the existing schedule.

The need depends mainly on the number of interfaces.

  • Separate trade packages

    Separate trade packages multiply the number of contractors to sequence.

  • An occupied or constrained site

    It calls for precise phasing.

  • A refurbishment

    It brings discoveries that force rescheduling.

  • A site already late or stalled

    OPC comes in as part of a stalled site recovery, after a written condition report.

To define the scope and compare proposals, see our guide OPC services: cost, deliverables and selection criteria. If what you need is help organising the client side itself, see owner’s representation (AMO).

Frequently asked questions

Another question? Call us on +33 1 72 68 22 71 or email contact@primoe.fr.

Let’s talk about your site

What is the difference between OPC and MOEX?

OPC organises the timing of the works: schedule, coordination, interfaces. Construction supervision (MOEX) directs the technical execution: compliance, quality, sign-off of the works. The two services complement each other and are often commissioned together.

What does OPC stand for?

Ordonnancement, pilotage et coordination: scheduling, management and coordination. Scheduling sets the order of tasks, management keeps the works to the schedule, and coordination settles the interfaces between contractors.

What is the difference between OPC and DET?

DET (direction de l’exécution des contrats de travaux, direction of the works contracts) is a lead consultant’s task: it checks that the works comply with the drawings and the contracts, and checks the contractors’ interim valuations. OPC does not judge the quality of the works: it organises the timing and sequence of the contractors’ work. On a project let in separate trade packages, both are needed.

What is an OPC manager?

The person who runs the OPC assignment on site: they draw up the detailed schedule, chair the coordination meetings and track each contractor’s progress.

Is OPC compulsory?

French law does not require it for private projects, but once a site has more than a few trade packages, going without it is paid for in delays and interface disputes. It is better to provide for it in the contracts.

Can you take over OPC on a site that is running late?

Yes. We audit the existing schedule, identify the real critical path and rebuild a schedule that can be met, then we enforce it. See also our stalled site recovery service.

What types of project do you work on?

Multi-unit housing, major refurbishments, mixed-use projects and serviced residences, in Paris and Île-de-France.

How much does an OPC assignment cost?

At PRIMOE, an OPC assignment costs between 0.8 and 2% of the cost of the works excl. VAT. Where it falls in that range depends on the number of contractors to coordinate, the length of the works, the site constraints and how much presence on site is required. There is no official fee scale: the assignment is paid as a fixed fee, by phase, or on a time basis within agreed limits. A clear proposal states what happens if the works take longer than planned or if meetings become more frequent.

Does OPC replace the health and safety coordinator?

No. Under French law, health and safety coordination is required as soon as several contractors work on a site (Article L4532-2 of the Labour Code), and the coordinator is appointed by the client. OPC organises the schedule; the health and safety coordinator (coordonnateur SPS) relies on that schedule to prevent the risks of contractors working at the same time.

Does the OPC consultant apply delay penalties?

Penalties are set by the contracts and applied by the client, usually on the lead consultant’s recommendation when payments are made. The OPC consultant provides the evidence: contractual dates, delays observed and causes recorded as the works proceed.

Contact

Let’s talk about your project.

A building to study, a construction site to run or restart, an operator to find: tell us where you stand.

3 rue Alfred Roll, 75017 Paris, France · Projects across Paris and Île-de-France

Or describe your project in a few lines.

Your details are used only to reply to you. They are never passed on or used for marketing. Your data (in French)