Seine-side elevation in the preliminary design: former hotel-restaurant converted to retail, dark plinth and ground-floor shop windows

Yvelines · 2026

A hotel-restaurant converted to retail, in a flood zone

  • Retail
  • Refurbishment
  • Tender documents
  • Regulatory study
  • Studies

In the Yvelines (Île-de-France), on the banks of the Seine, PRIMOE studied the conversion of a closed hotel-restaurant of about 2,150 m² into a food store: digital model survey, tender documents, cost estimate and a regulatory study in a flood zone.

Key facts

The project

Location
Yvelines, on the banks of the Seine
Brief
Food store, sales floor and stockrooms
Floor area
About 2,150 m² over four levels

The building

Existing
Closed hotel and restaurant
Constraint
Flood zone (Seine flood risk prevention plan, PPRI)
Approach
Existing volume kept, no added storey and no new footprint

PRIMOE’s role

Existing conditions
Digital model of the existing building
Tendering
Tender documents (DCE) in 16 trade packages, specifications (CCTP) and pricing schedules (DPGF)
Cost
All-trades cost estimate
Regulations
Local zoning plan (PLU) and flood risk

The Seine-side elevation

The same volume, opened up to the street.

The changes are in the ground floors, the openings and the materials. Design, tender and cost estimate all start from the same survey.

16
trade packages in the tender documents
188
clauses in the technical specification
12
preliminary design sheets
Seine-side elevation in the preliminary design: dark plinth, ground-floor shop windows, timber louvres upstairs
Shop windows on the ground floor, timber louvres in front of the stockrooms

Our role on the project

PRIMOE surveyed the existing building into a digital model, then designed the conversion to the tenant’s brief. The tender documents were written package by package, with specifications (CCTP) and price breakdowns, and the project was costed across all trades.

As the site is in a flood zone, the regulatory study checked what the flood risk prevention plan allows, down to the parking. Building conversion explains this approach.

Milestones

  1. Tenant’s brief

  2. Model, tender documents and cost estimate

  3. Preliminary design

  4. Regulatory study

Contact

Let’s talk about your project.

A building to study, a construction site to run or restart, an operator to find: tell us where you stand.

3 rue Alfred Roll, 75017 Paris, France · Projects across Paris and Île-de-France

Or describe your project in a few lines.

Your details are used only to reply to you. They are never passed on or used for marketing. Your data (in French)