Roissy-en-Brie (77) · 2025 – 2026

46 homes in the centre of Roissy-en-Brie, handed over in July 2026

  • Apartment buildings
  • Construction supervision
  • OPC
  • Handed over

A 46-home residence in the centre of Roissy-en-Brie, in Île-de-France, for SCCV CENTREVILLE – REAL PROMOTION. PRIMOE provided construction supervision (MOEX) and scheduling and coordination (OPC) for 16 months, from the structural works to handover in July 2026.

Key facts

The project

Location
Roissy-en-Brie (77), town centre
Client
SCCV CENTREVILLE – REAL PROMOTION
Brief
46 flats
Handover
July 2026

The building

Height
Ground plus four storeys, timber-framed roof space, tiled gable roofs
Access
External walkways onto the courtyard
Organisation
Two buildings, A and B; some twenty separate trades

The project team

Construction supervision (MOEX) and OPC
PRIMOE, 16 months through to handover

Our role on the project

PRIMOE ran the construction phase for 16 months, providing construction supervision (MOEX) and OPC: approval of construction drawings, checking interim valuations, and scheduling and coordinating some twenty separate trades, package by package.

Every week, a site meeting and written site minutes sent to every contractor: 92 sets of minutes in all, the last in June 2026. The show flat was accepted in November 2025, before the buildings were weathertight; practical completion and clearing the snags were then managed through to the handover of the homes in July 2026.

Milestones

  1. Ground floor goes up

  2. Third and fourth floors go up

  3. Roof structure and waterproofing

  4. Show flat accepted, building A weathertight

  5. 92nd set of site minutes

  6. Handover

Sixteen months on site, in pictures

Earthmoving plant at the bottom of the excavation, site hoarding and neighbouring houses
01Earthworks and foundations
Aerial view of the site: buildings rising around the courtyard, tower cranes and water tower
02The structure from the air
Upper floors rising around the courtyard, tower crane in the foreground
03Upper floors go up
Concrete gables standing on the top floor, operatives at work
04The gables
Timber roof trusses seen from the roof space, windows installed
05Roof structure and roof space
Scaffolded façades, gable roofs complete
06Scaffolding and façades
Tiled roofs complete, façades being finished
07Tiled roofs
Courtyard façades: white walkways and gable roofs
08Courtyard façades
Corner of the courtyard, walkways and gables
09Walkways and roofs

Contact

Let’s talk about your project.

A building to study, a construction site to run or restart, an operator to find: tell us where you stand.

3 rue Alfred Roll, 75017 Paris, France · Projects across Paris and Île-de-France

Or describe your project in a few lines.

Your details are used only to reply to you. They are never passed on or used for marketing. Your data (in French)